Wireless Liquid  temperature Sensor w/3ft lead

The AmationSource.com wireless water detect plus sensor alerts you of potential property damage that results from flooding or leaks. Place this sensor anywhere flooding or faulty plumbing could cause a problem.


Product Description

The wireless water detect plus sensor alerts you of potential property damage that results from flooding or leaks. Place this sensor anywhere flooding or faulty plumbing could cause a problem. 

The
AmationSource.com Wireless Water Detection Plus Sensor detects when water is present by completing the circuit between the two prongs at the end of the water probe. The spot detection probe can be positioned and mounted a set distance above the ground eliminating false alarms. When water is present the sensor will immediately turn on the RF radio and transmit the data to the wireless gateway and AmationSource.com Online Sensor Monitoring and Notification System, allowing the user to immediately receive an SMS text or email alert. The sensor can be configured to detect both the presence and non-presence of water.

Note - If customized external leads are needed for
placement, call AmationSource.com to
customize your order.

  Product Feature

  • Water Spot Detect
  • 3Ft. Lead probe
  • 900 MHz Operating Frequency
  • Replaceable 3.0V Coin Cell Battery
  • 250 - 300 ft. non-line-of-sight device range*
  • At 1 hour heartbeat setting, coin cell battery will last ~ 1-2 Years. **
  • FCC and IC certified.
  • Senses immediate presence of water.
  • Can also sense non-presence of water.
  • Small size is ideal for embedded applications.
  • User defined thresholds for alerts and notifications.

  * Actual range may vary depending on environment.
** Battery life is determined by sensor reporting 
    frequency and other variables.

  What's in the box?


  • Wireless Sensor
  • CR2032 Coin Cell Battery
  • Mounting Screws
  • Mounting Tape

Write a review

Note: HTML is not translated!
    Bad           Good

Welcome To AmationSource.com - Downloads will be available soon.

CLICK HERE FOR DOWNLOADS

If Pop-Up doesn't open acess Downloads from Main menu; Datasheets on the Flyout Menu

Wireless Liquid temperature Sensor w/3ft lead

Free Shipping

This product qualifies for free shipping.

  • $69.00

Tags: Wireless Monitor,

The AmationSource.com wireless temperature sensor uses an external sensor probe to measure tempera..
$59.00

Everything you need to start monitoring temperatures remotely using existing onsite Internet (conn..
$481.00

The AmationSource.com Wireless Water Rope Sensor detects conductive liquids anywhere along th..
$129.00

The AmationSource.com wireless temperature sensor uses a thermistor to accurately measure temperatur..
$49.50

The USB gateway allows your AmationSource Wireless Sensors to communicate with the online wireless s..
$49.00

Zen IoT GatewayEdge Processing DeviceConnect you..
$1,180.00

The Merlin accepts one of several popular input signal types to display Universal input: ..
$192.00

Accepts inputs from a wide range of industry standard sensors and transmitters outputting 0/4-20mA o..
$188.00

Required to program the following: any Zen, Javelin, Twin Link, Sentry, Merlin, Pathfinder or TM Ser..
$49.00

TM-2DLI 2-Wire Isolated Transmitter, Universal Input, 4-..
$142.00